page_head_Bg

Miradi

Halo, njoo kushauriana na bidhaa zetu!
/steel-space-grid-painting-process-product/

Mradi huu ni wa nusu duara ya nafasi ya viwanda / urefu ni mita 51 / urefu wa jumla mita 688 / jumla ya urefu wa mita 46

Programu ya kompyuta hutengeneza moja kwa moja uzito wa kujitegemea wa sura ya nafasi ya chuma;

Mzigo lazima ufanyie kazi kwenye nodes, na wanachama hawana kubeba mizigo ya upande;

Muundo wa sura unapaswa kuwa madhubuti kulingana na kiwango cha tasnia "viungo vya sura ya nafasi ya mpira wa pamoja" JG/T10-2009.

 

Sura ya nafasi ya chuma imehesabiwa na iliyoundwa na programu ya MST2020.

Mbali na kukidhi mahitaji ya kanuni ya nyenzo ya kitaifa, chuma kinachotumiwa katika mradi huu kinapaswa pia kukidhi mahitaji yafuatayo:

a) Uwiano wa thamani iliyopimwa ya nguvu ya mavuno ya chuma kwa thamani iliyopimwa ya nguvu ya mvutano haipaswi kuwa kubwa kuliko 0.85;

b) Chuma kinapaswa kuwa na hatua za wazi za mavuno, na urefu unapaswa kuwa zaidi ya 20%;

c) Chuma kinapaswa kuwa na weldability nzuri na ushupavu wa athari unaohitimu;

Muundo wa fremu ya nafasi ya chuma hupitisha muundo wa programu ya 3D3S (toleo la 14.0) ya muundo wa bomba unaosaidiwa na kompyuta na mfumo wa utengenezaji kufanya uchanganuzi wa nguvu ya ndani ya wanachama na muundo wa kiotomatiki wa mkazo kamili kwenye kompyuta ndogo, na ubinafsishaji. mzigo wa uzito wa sura ya gridi ya taifa huwekwa kiotomatiki katika uchanganuzi wa nguvu ya ndani.

Urefu uliohesabiwa wa fimbo ni L0 = L, na uwiano wa upole wa fimbo ya ufunguo ni fimbo ya kufunga ≤ 200 na fimbo ya compression ≤ 150. Uwiano wa nyembamba wa fimbo nyingine ni tie fimbo ≤ 250, fimbo ya shinikizo ≤ 180.

 

This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009
This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009
2 (2)
This project is a semi-circular industrial space frame / height is 51 meters / total length 688 meters / total span 46 meters The computer program automatically forms the self-weight of the grid; The load must act on the nodes, and the members do not bear lateral loads; The frame structure should be strictly in accordance with the industry standard "Steel grid bolt ball joint" JG/T10-2009

Muda wa posta: Mar-10-2022